
Image source : social media
Bilkul Sateek News
Gurugram, 11 April – In preparation for the summer season, the Dakshin Haryana Bijli Vitran Nigam (DHBVN) has announced scheduled maintenance activities on Saturday, April 12, at the 66 kV power substations located in DLF Phase 5, Sector 43, and Sector 28. These maintenance efforts aim to ensure uninterrupted power supply during the high-demand summer months.
The maintenance work will necessitate temporary power outages across various areas, each lasting approximately 1.5 hours. The planned schedule for the power interruptions is as follows:
- 7:00 AM to 8:30 AM: Odys Hotel and Sarv Mangalam
- 8:30 AM to 10:00 AM: DLF Phase 1, Sector 42, Roop Ram, and Gulab Farm
- 10:00 AM to 11:30 AM: Golf Course, Magnolia-2, Aralia, and Belair
- 12:00 PM to 1:30 PM: Amax-2, Krist, Sumit, plotted areas of DLF Phase 5, South Point Mall, and Exclusive Floors
Residents and businesses in the affected areas are advised to plan accordingly to minimize inconvenience during these brief outages. DHBVN has assured that all efforts will be made to complete the maintenance work within the stipulated time frames.
For further information or assistance, consumers can contact DHBVN’s customer service helpline or visit their official website.
— End of Report